212 Crescent St
The Journey Through the Building Process
Overall Job Completion
- Overall Completion 100%
Pre-construction Phase
- First Visit 100%
- Site Visit 100%
- Sales 100%
- Workbooks Created 100%
- Health Permit (Septic and Well Permits) 100%
- Building Permit 100%
- Construction Preview 100%
Utilities
- Electric Application 100%
- Electrical Engineering Meeting 100%
- Natural Gas or Propane Application 100%
- Natural Gas Engineering Meeting 100%
Construction Phase
- Workbooks Review 100%
- Escavation (Hole Dug) 100%
- Footers Poured 100%
- Foundation Poured (Walls) 100%
- Foundation Floor Poured (Garages and Basements Only) 100%
- Sill Plates Installed 100%
- Partial Back Fill 100%
- Egress Windows and Jackposts Ordered 100%
- House Set 100%
- Electrical Installed 100%
- Gas Installed 100%
- HVAC Installed 100%
- Plumbing Finished 100%
- Gutters Installed 100%
- Flatwork (Sidewalks, Porch Caps, and/or Driveway) 100%
Fit & Finish
- Marriage Line 100%
- Drywall Repairs 100%
- Fit & Finish 100%
Aftermarket
- 6 Months 100%
- 1 Year 100%
Certificate of Occupancy
- Electrical Inspection 100%
- Mechanical Inspection 100%
- Plumbing Inspection 100%
- Final Inspection 100%
Notes
Well On It’s Way
Crescent Street in Goshen has been a hot commodity, and we have created the perfect storm. The sewer line and water were trenched into the home before the winter set, and we have gas on the way and electricity. NIPSCO is keeping us at the forefront.
Kenny finally added the pictures of the progress. There has been more progress since most of these pictures were taken, such as the stoops have been built on the side of the home and the front gable has been built. The basement stairs and the basement have been studded out; including the garage floor. The porch cap is on the next stage for the outdoor.
The garage is scheduled for the last week of November to be built and completed.