1308 Magnolia

The Journey Through the Building Process

Overall Job Completion

  • Overall Completion 100% 100%

SET DATE: 12/29/2022

(Weather Permitting)

Pre-construction Phase

  • First Visit 100% 100%
  • Site Visit 100% 100%
  • Sales 100% 100%
  • Workbooks Created 100% 100%
  • Health Permit (Septic and Well Permits) 100% 100%
  • Building Permit 100% 100%
  • Construction Preview 100% 100%

Utilities

  • Electric Application 100% 100%
  • Electrical Engineering Meeting 100% 100%
  • Natural Gas or Propane Application 100% 100%
  • Natural Gas Engineering Meeting 100% 100%

Construction Phase

  • Workbooks Review 100% 100%
  • Escavation (Hole Dug) 100% 100%
  • Footers Poured 100% 100%
  • Foundation Poured (Walls) 100% 100%
  • Foundation Floor Poured (Garages and Basements Only) 100% 100%
  • Sill Plates Installed 100% 100%
  • Partial Back Fill 100% 100%
  • Egress Windows and Jackposts Ordered 100% 100%
  • House Set 100% 100%
  • Garage Build 100% 100%
  • Electrical Installed 100% 100%
  • Gas Installed 100% 100%
  • HVAC Installed 100% 100%
  • Plumbing Finished 100% 100%
  • Gutters Installed 100% 100%
  • Flatwork (Sidewalks, Porch Caps, and/or Driveway) 100% 100%

Fit & Finish

  • Marriage Line 100% 100%
  • Drywall Repairs 100% 100%
  • Fit & Finish 100% 100%
  • Stoops 100% 100%

Aftermarket

  • 6 Months 100% 100%
  • 1 Year 100% 100%

Certificate of Occupancy

  • Electrical Inspection 100% 100%
  • Mechanical Inspection 100% 100%
  • Plumbing Inspection 100% 100%
  • Final Inspection 100% 100%

Progress Pictures

Videos

Photos

Notes

C of O obtained. Daniel and Bobby have a few more items to complete.

Electrical Update

Magnolia has had the electrical pole set, and our electrician has been there and will be done tomorrow. We are waiting on our HVAC company to get the gas lines in to have that placed.

House Set 12/29/2022

The house set went very well today. I didn’t get my full walkthrough, but I will complete that tomorrow. Overall, the house looks fantastic. There are a few cracks, paint is slightly irregular, but the house set was done very well.

The property is very muddy; if you visit, wear something that you don’t mind getting ruined.

Update for Magnolia

Per the concrete shortages, we have to postpone the Magnolia build.

Kenny and Stuart Meade our going to stake out on 11/18/2022.

The new tentative set date is 12/15/2022.